IAW were appointed to carry out full structural engineering service on this new 6 units 4 storey apartment block. The building comprised steelwork superstructure with composite slabs, and piled foundation with RC ground beams substructure. The design encountered various challenges due to staggered structural arrangement, boundary condition and complex ground geology.
[ngg src=”galleries” ids=”17″ display=”basic_thumbnail” thumbnail_crop=”0″]