IAW were appointed to undertake temporary works design for enabling extensive structural alteration works on this proposed residential refurbishment scheme. Our scope also involved design of contiguous piled retaining wall on the boundary to enable a new basement construction.

[ngg src=”galleries” ids=”14″ display=”basic_thumbnail” thumbnail_crop=”0″]